Timber frame extensions in Berkshire
Planning a timber frame extension in Berkshire? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide priceFrom £23,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Towns covered11
- Site visitFree, no obligation

Towns in Berkshire
Extensions in and around Berkshire
Towns we cover in Berkshire include Reading, Slough, Bracknell, Maidenhead, Wokingham, Newbury, Earley, Windsor. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
What should I budget for a timber frame extension in Berkshire?
Prices below are for Berkshire, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Berkshire: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £23,500 – £28,500 | £27,500 – £36,000 | £34,500 – £46,000 |
| 4 m × 5 m 20 m² | £39,000 – £47,500 | £45,500 – £59,500 | £58,000 – £76,500 |
| 5 m × 6 m 30 m² | £58,500 – £71,000 | £68,500 – £89,500 | £87,000 – £114,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in Berkshire
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who a timber frame extension suits
- Homeowners who want strong energy performance
- Sites where weight or speed matters
- Contemporary designs with timber or board cladding
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about timber frame extensions
Who do I contract with for a timber frame extension in Berkshire?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Berkshire?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Berkshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,960 to £3,810 per m² including VAT.
Book a free site visit in Berkshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.