Timber frame extensions in Battersea
If you live in Battersea and want more space without moving, a timber frame extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in BatterseaFrom £27,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsSW1W, SW3, SW4, SW8, SW10

Covering Battersea
Site visits are available across Battersea (SW1W, SW3, SW4, SW8, SW10, SW11). Nearby, we also take on projects in Chelsea (1 mile), Fulham (2 miles), Brixton (2 miles), Earlsfield (2 miles).
For homes towards Surrey, Ewell is around 10 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Included in a typical project
- Foundations, often lighter than masonry
- Fire and acoustic details where needed
- Breathable wall build-up with insulation
- Cladding, render or brick slip finish
- Frame design and structural calculations
Do I need planning permission in Battersea?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What should I budget for a timber frame extension in Battersea?
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Battersea: £2,280 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £27,000 – £33,000 | £31,500 – £41,500 | £40,500 – £53,500 |
| 4 m × 5 m 20 m² | £45,500 – £55,000 | £53,000 – £69,000 | £67,500 – £88,500 |
| 5 m × 6 m 30 m² | £68,000 – £82,000 | £79,500 – £103,500 | £101,000 – £133,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a timber frame extension in Battersea
How long does a timber frame extension take to build in Battersea?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Battersea?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Battersea, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £2,280 to £4,420 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in Battersea
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.