Single-storey rear extensions across Tyne and Wear
Planning a single-storey extension in Tyne and Wear? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide priceFrom £19,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Towns covered15
- Site visitFree, no obligation

Towns in Tyne and Wear
What is included
- Building regulations drawings and structural calculations
- Foundations, drainage and groundworks
- Doors, windows, insulation, plastering and first fix to finish
- Flat or pitched roof, rooflights or lantern
- Measured survey and design
What should I budget for a single-storey extension in Tyne and Wear?
Labour and material costs vary across the UK, so for Tyne and Wear we use our North East England factor (×0.91). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Tyne and Wear: £1,590 to £3,090 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,000 – £22,500 | £22,000 – £28,500 | £28,000 – £37,500 |
| 4 m × 5 m 20 m² | £31,500 – £37,500 | £37,000 – £47,500 | £47,000 – £62,000 |
| 5 m × 6 m 30 m² | £47,500 – £56,000 | £55,500 – £71,000 | £70,500 – £93,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Tyne and Wear?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Tyne and Wear address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Tyne and Wear
Towns we cover in Tyne and Wear include Newcastle upon Tyne, Sunderland, South Shields, Gateshead, Washington, Tynemouth, Wallsend, Newburn. The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a single-storey extension in Tyne and Wear
Who do I contract with for a single-storey extension in Tyne and Wear?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a single-storey extension take to build in Tyne and Wear?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Tyne and Wear?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
Book a free site visit in Tyne and Wear
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.