Troon single-storey extensions, designed and built
Our design and build teams take on single-storey extensions in Troon, from the first measured survey through planning and building control to the finished room.
- Guide price in TroonFrom £20,500 inc VAT
- PlanningScottish householder rules; building warrant needed
- Build time10–16 weeks on site
- Postcode districtsKA10

Single-storey extension prices in Troon
Prices below are for Troon, using the Scotland factor of ×0.98. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Troon: £1,720 to £3,330 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,500 – £24,500 | £24,000 – £31,000 | £30,500 – £40,000 |
| 4 m × 5 m 20 m² | £34,000 – £40,500 | £40,000 – £51,000 | £50,500 – £67,000 |
| 5 m × 6 m 30 m² | £51,000 – £60,500 | £60,000 – £76,500 | £76,000 – £100,000 |
Try the guide-price tool to see a range for your own size and finish.
What is included
- Measured survey and design
- Flat or pitched roof, rooflights or lantern
- Walls, steel beams and the new opening into the house
- Foundations, drainage and groundworks
Planning and approvals in Troon
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.
In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.
Applications are decided by your council as planning authority.
Local to Troon
We cover Troon and the postcode districts KA10. We also work in nearby Irvine (5 miles), Ayr (6 miles), Kilmarnock (7 miles), Kilwinning (8 miles).
Newton Mearns, in Renfrewshire and Inverclyde, is roughly 20 miles from Troon and also on our list. Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Troon home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Troon
Will my neighbours in Troon be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
Who do I contract with for a single-storey extension in Troon?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a single-storey extension take to build in Troon?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
Book a free site visit in Troon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end