Single-storey rear extensions across Suffolk
If you live in Suffolk and want more space without moving, a single-storey extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide priceFrom £22,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Towns covered9
- Site visitFree, no obligation

Towns in Suffolk
What should I budget for a single-storey extension in Suffolk?
These guide figures apply our East of England adjustment (×1.06) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Suffolk: £1,860 to £3,600 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £22,000 – £26,500 | £26,000 – £33,500 | £33,000 – £43,500 |
| 4 m × 5 m 20 m² | £37,000 – £43,500 | £43,000 – £55,500 | £55,000 – £72,500 |
| 5 m × 6 m 30 m² | £55,500 – £65,500 | £65,000 – £83,000 | £82,500 – £108,500 |
Try the guide-price tool to see a range for your own size and finish.
Who a single-storey extension suits
- Semi-detached and detached houses with a usable rear garden
- Homeowners who want open-plan living onto the garden
- Terraced houses that want a deeper kitchen across the full width
Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to Suffolk
Towns we cover in Suffolk include Ipswich, Lowestoft, Bury St Edmunds, Haverhill, Felixstowe, Sudbury, Stowmarket, Newmarket. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Single-storey extension questions answered
Do I need building regulations approval in Suffolk?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Suffolk be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does a single-storey extension take to build in Suffolk?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
How deep can a single-storey rear extension be without planning permission?
In England, up to 3 m beyond the original rear wall on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Through the larger home extension prior approval scheme those depths rise to 6 m and 8 m. Wales, Scotland and Northern Ireland use their own rules, which we check for your address.
Book a free site visit in Suffolk
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end