Single-storey rear extensions for homes in Stoke-on-Trent
From the first sketch to final sign-off, we plan and build single-storey extensions in Stoke-on-Trent and the surrounding Staffordshire area.
- Guide price in Stoke-on-TrentFrom £20,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsST1, ST2, ST3, ST4, ST5

How much does a single-storey extension cost in Stoke-on-Trent?
These guide figures apply our West Midlands adjustment (×0.97) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Stoke-on-Trent: £1,700 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,000 – £24,000 | £23,500 – £30,500 | £30,000 – £40,000 |
| 4 m × 5 m 20 m² | £33,500 – £40,000 | £39,500 – £50,500 | £50,000 – £66,000 |
| 5 m × 6 m 30 m² | £50,500 – £60,000 | £59,500 – £76,000 | £75,500 – £99,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Covering Stoke-on-Trent
Postcode districts we cover around Stoke-on-Trent include ST1, ST2, ST3, ST4, ST5, ST6. Neighbouring towns we cover include Newcastle-under-Lyme (2 miles), Longton (3 miles), Kidsgrove (6 miles), Leek (10 miles).
Just over the Cheshire border, Congleton is about 11 miles away. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
Planning rules that apply in Stoke-on-Trent
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Measured survey and design
- Doors, windows, insulation, plastering and first fix to finish
- Walls, steel beams and the new opening into the house
- Planning route checked and the right approval obtained
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Single-storey extension questions answered
Will my neighbours in Stoke-on-Trent be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a single-storey extension in Stoke-on-Trent?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a single-storey extension take to build in Stoke-on-Trent?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
Book a free site visit in Stoke-on-Trent
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end