Single-storey rear extensions for homes in Skipton
Our design and build teams take on single-storey extensions in Skipton, from the first measured survey through planning and building control to the finished room.
- Guide price in SkiptonFrom £19,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsBD23

Planning and approvals in Skipton
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Skipton
We cover Skipton and the postcode districts BD23. We also work in nearby Harrogate (21 miles), Ripon (23 miles), Northallerton (33 miles), York (40 miles).
Colne, in Lancashire, is roughly 10 miles from Skipton and also on our list. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.
What should I budget for a single-storey extension in Skipton?
For Skipton we adjust our national guide rates by ×0.94, the factor we use for Yorkshire and the Humber. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Skipton: £1,640 to £3,200 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,500 | £23,000 – £29,500 | £29,000 – £38,500 |
| 4 m × 5 m 20 m² | £32,500 – £39,000 | £38,500 – £49,000 | £48,500 – £64,000 |
| 5 m × 6 m 30 m² | £49,000 – £58,000 | £57,500 – £73,500 | £73,000 – £96,000 |
For a figure based on your own dimensions, use our guide-price tool.
What we take care of
- Flat or pitched roof, rooflights or lantern
- Foundations, drainage and groundworks
- Measured survey and design
- Doors, windows, insulation, plastering and first fix to finish
Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Single-storey extension questions answered
Do I need building regulations approval in Skipton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Skipton?
Yes. We cover Skipton and the surrounding parts of North Yorkshire. Site visits are free and there is no obligation.
How long does a single-storey extension take to build in Skipton?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Book a free site visit in Skipton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end