Single-storey rear extensions for homes in Ripley

From the first sketch to final sign-off, we plan and build single-storey extensions in Ripley and the surrounding Derbyshire area.

  • Guide price in RipleyFrom £19,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsDE5
Single-storey rear extension in matching brick with a roof lantern and sliding doors

How much does a single-storey extension cost in Ripley?

For Ripley we adjust our national guide rates by ×0.95, the factor we use for East Midlands. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Ripley: £1,660 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£19,500 – £23,500£23,000 – £30,000£29,500 – £39,000
4 m × 5 m
20 m²
£33,000 – £39,000£38,500 – £49,500£49,000 – £65,000
5 m × 6 m
30 m²
£49,500 – £58,500£58,000 – £74,500£74,000 – £97,000

For a figure based on your own dimensions, use our guide-price tool.

Included in a typical project

  • Planning route checked and the right approval obtained
  • Building regulations drawings and structural calculations
  • Measured survey and design
  • Foundations, drainage and groundworks
  • Doors, windows, insulation, plastering and first fix to finish

Planning rules that apply in Ripley

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Local to Ripley

Our survey diary covers Ripley, including DE5. We also work in nearby Heanor (2 miles), Belper (3 miles), Alfreton (4 miles), Ilkeston (6 miles).

Just over the Nottinghamshire border, Eastwood is about 5 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions people ask about single-storey extensions

Will my neighbours in Ripley be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Ripley?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a single-storey extension take to build in Ripley?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Can I stay in the house during the build?

Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.

Flat roof or pitched roof?

Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.

Book a free site visit in Ripley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote