Single-storey rear extensions for homes in Prestatyn
Our design and build teams take on single-storey extensions in Prestatyn, from the first measured survey through planning and building control to the finished room.
- Guide price in PrestatynFrom £19,500 inc VAT
- PlanningWelsh permitted development rules (rear up to 4 m)
- Build time10–16 weeks on site
- Postcode districtsLL19

Extensions in and around Prestatyn
We cover Prestatyn and the postcode districts LL19. We also work in nearby Rhyl (4 miles), Flint (13 miles), Colwyn Bay (13 miles), Llandudno (18 miles).
Just over the Gwynedd border, Bangor, Gwynedd is about 31 miles away. In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.
Guide prices for Prestatyn
Labour and material costs vary across the UK, so for Prestatyn we use our Wales factor (×0.93). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Prestatyn: £1,630 to £3,160 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,000 | £22,500 – £29,500 | £29,000 – £38,000 |
| 4 m × 5 m 20 m² | £32,500 – £38,500 | £38,000 – £48,500 | £48,000 – £63,500 |
| 5 m × 6 m 30 m² | £48,500 – £57,500 | £57,000 – £73,000 | £72,500 – £95,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Prestatyn
In Wales a single-storey rear extension can usually project up to 4 m beyond the rear wall without a planning application, if it is no more than 4 m high, keeps eaves to 3 m and overall height to 4 m within 2 m of a boundary, and covers no more than half the land around the original house. Wales has no larger home extension prior approval scheme.
The planning position for a specific Prestatyn address depends on its history and any designations, which is why we check it at the first visit.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
What we take care of
- Doors, windows, insulation, plastering and first fix to finish
- Flat or pitched roof, rooflights or lantern
- Building regulations drawings and structural calculations
- Planning route checked and the right approval obtained
- Walls, steel beams and the new opening into the house
- Measured survey and design
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Prestatyn home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Prestatyn
Do I need building regulations approval in Prestatyn?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a single-storey extension take to build in Prestatyn?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do you cover all of Prestatyn?
Yes. We cover Prestatyn and the surrounding parts of Clwyd. Site visits are free and there is no obligation.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
Book a free site visit in Prestatyn
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.