Single-storey rear extensions in Penicuik: design, approvals and build
Planning a single-storey extension in Penicuik? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in PenicuikFrom £20,500 inc VAT
- PlanningScottish householder rules; building warrant needed
- Build time10–16 weeks on site
- Postcode districtsEH26

Is a single-storey extension right for your house?
- Semi-detached and detached houses with a usable rear garden
- Homeowners who want open-plan living onto the garden
- Terraced houses that want a deeper kitchen across the full width
Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.
What should I budget for a single-storey extension in Penicuik?
Prices below are for Penicuik, using the Scotland factor of ×0.98. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Penicuik: £1,720 to £3,330 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,500 – £24,500 | £24,000 – £31,000 | £30,500 – £40,000 |
| 4 m × 5 m 20 m² | £34,000 – £40,500 | £40,000 – £51,000 | £50,500 – £67,000 |
| 5 m × 6 m 30 m² | £51,000 – £60,500 | £60,000 – £76,500 | £76,000 – £100,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Local to Penicuik
Our survey diary covers Penicuik, including EH26. The same team covers Bonnyrigg (6 miles), Edinburgh (8 miles), Musselburgh (10 miles), Broxburn (12 miles), all within easy reach.
For homes towards Scottish Borders, Peebles is around 12 miles away. Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.
Do I need planning permission in Penicuik?
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.
In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.
Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.
Building close to a public sewer needs the agreement of Scottish Water, which we check during design.
Applications are decided by your council as planning authority.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about single-storey extensions
Do I need building regulations approval in Penicuik?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
How long does a single-storey extension take to build in Penicuik?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Will my neighbours in Penicuik be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Book a free site visit in Penicuik
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.