Single-storey rear extensions in Hinckley: design, approvals and build
Hinckley homeowners can use us for the whole single-storey extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in HinckleyFrom £19,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsLE10

Planning and approvals in Hinckley
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Doors, windows, insulation, plastering and first fix to finish
- Planning route checked and the right approval obtained
- Flat or pitched roof, rooflights or lantern
- Building regulations drawings and structural calculations
- Foundations, drainage and groundworks
- Walls, steel beams and the new opening into the house
Single-storey extension prices in Hinckley
Labour and material costs vary across the UK, so for Hinckley we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Hinckley: £1,660 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,500 | £23,000 – £30,000 | £29,500 – £39,000 |
| 4 m × 5 m 20 m² | £33,000 – £39,000 | £38,500 – £49,500 | £49,000 – £65,000 |
| 5 m × 6 m 30 m² | £49,500 – £58,500 | £58,000 – £74,500 | £74,000 – £97,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Hinckley
Our survey diary covers Hinckley, including LE10. Neighbouring towns we cover include Earl Shilton (4 miles), Wigston (12 miles), Leicester (12 miles), Coalville (13 miles).
The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Hinckley home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about single-storey extensions
Do you cover all of Hinckley?
Yes. We cover Hinckley and the surrounding parts of Leicestershire. Site visits are free and there is no obligation.
How long does a single-storey extension take to build in Hinckley?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Hinckley?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
Book a free site visit in Hinckley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end