Camborne single-storey extensions, designed and built

Our design and build teams take on single-storey extensions in Camborne, from the first measured survey through planning and building control to the finished room.

  • Guide price in CamborneFrom £21,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsTR14
Single-storey rear extension in matching brick with a roof lantern and sliding doors

Single-storey extension prices in Camborne

Labour and material costs vary across the UK, so for Camborne we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Camborne: £1,780 to £3,470 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£21,000 – £25,500£25,000 – £32,000£31,500 – £42,000
4 m × 5 m
20 m²
£35,500 – £42,000£41,500 – £53,500£53,000 – £69,500
5 m × 6 m
30 m²
£53,500 – £63,000£62,500 – £80,000£79,500 – £104,500

For a figure based on your own dimensions, use our guide-price tool.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Flat or pitched roof, rooflights or lantern
  • Building regulations drawings and structural calculations
  • Walls, steel beams and the new opening into the house
  • Doors, windows, insulation, plastering and first fix to finish

Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.

Working in Camborne

Across TR14, we can visit, measure and advise. Nearby, we also take on projects in Redruth (4 miles), Falmouth (11 miles), Truro (11 miles), Penzance (12 miles).

In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Single-storey extension questions answered

Will my neighbours in Camborne be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Camborne, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a single-storey extension take to build in Camborne?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Can I stay in the house during the build?

Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.

How deep can a single-storey rear extension be without planning permission?

In England, up to 3 m beyond the original rear wall on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Through the larger home extension prior approval scheme those depths rise to 6 m and 8 m. Wales, Scotland and Northern Ireland use their own rules, which we check for your address.

Book a free site visit in Camborne

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote