Single-storey rear extensions across Bristol
Our design and build teams take on single-storey extensions in Bristol, from the first measured survey through planning and building control to the finished room.
- Guide priceFrom £21,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Towns coveredWhole area
- Site visitFree, no obligation

Towns in Bristol
We cover the whole of Bristol.
Extensions in and around Bristol
We cover the whole of Bristol. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.
Guide prices for Bristol
These guide figures apply our South West England adjustment (×1.02) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Bristol: £1,780 to £3,470 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £21,000 – £25,500 | £25,000 – £32,000 | £31,500 – £42,000 |
| 4 m × 5 m 20 m² | £35,500 – £42,000 | £41,500 – £53,500 | £53,000 – £69,500 |
| 5 m × 6 m 30 m² | £53,500 – £63,000 | £62,500 – £80,000 | £79,500 – £104,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
What we take care of
- Planning route checked and the right approval obtained
- Walls, steel beams and the new opening into the house
- Foundations, drainage and groundworks
- Flat or pitched roof, rooflights or lantern
- Measured survey and design
- Doors, windows, insulation, plastering and first fix to finish
Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.
Do I need planning permission in Bristol?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Bristol address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Bristol home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a single-storey extension in Bristol
Do you cover all of Bristol?
Yes, across the whole of Bristol. Site visits are free and there is no obligation.
How long does a single-storey extension take to build in Bristol?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Bristol?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How deep can a single-storey rear extension be without planning permission?
In England, up to 3 m beyond the original rear wall on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Through the larger home extension prior approval scheme those depths rise to 6 m and 8 m. Wales, Scotland and Northern Ireland use their own rules, which we check for your address.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Book a free site visit in Bristol
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.