house-extension.uk

Side return extensions for homes in Tyldesley

Thinking about a side return extension for your Tyldesley home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in TyldesleyFrom £17,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsM29, M38, M46, WN7
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Side return extension prices in Tyldesley

These guide figures apply our North West England adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Tyldesley: £2,000 to £3,610 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£17,000 – £20,500£18,000 – £23,000£22,500 – £29,000
2 m × 5.5 m
11 m²
£21,500 – £26,500£25,000 – £31,500£31,000 – £40,000
2.2 m × 7 m
15 m²
£29,500 – £36,000£34,000 – £43,000£42,500 – £54,500

Want a range for your exact size? The guide-price tool takes about a minute.

Local to Tyldesley

Site visits are available across Tyldesley (M29, M38, M46, WN7). Nearby, we also take on projects in Atherton (1 mile), Leigh (2 miles), Walkden (3 miles), Westhoughton (3 miles).

Golborne, in Merseyside, is roughly 6 miles from Tyldesley and also on our list. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.

Planning rules that apply in Tyldesley

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

The planning position for a specific Tyldesley address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Kitchen-ready shell or full finish
  • Removal of the side wall and new steelwork
  • New boundary wall or raised party wall
  • Design to keep daylight in the middle of the house
  • Party wall notice support (England and Wales)

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Tyldesley home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about side return extensions

How long does a side return extension take to build in Tyldesley?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Will my neighbours in Tyldesley be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who do I contract with for a side return extension in Tyldesley?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do side return extensions need planning permission?

In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.

How much does a side return extension cost?

Our guide range is about £2,000 to £3,610 per m² including VAT, so a typical 2 m × 5.5 m infill lands around £25,000 to £31,500 at standard spec in Tyldesley, more in London.

Book a free site visit in Tyldesley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote