Side return extensions across Skipton
Planning a side return extension in Skipton? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in SkiptonFrom £16,500 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsBD23

Guide prices for Skipton
For Skipton we adjust our national guide rates by ×0.94, the factor we use for Yorkshire and the Humber. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Skipton: £1,970 to £3,570 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £16,500 – £20,500 | £18,000 – £23,000 | £22,500 – £29,000 |
| 2 m × 5.5 m 11 m² | £21,500 – £26,000 | £24,500 – £31,500 | £31,000 – £39,500 |
| 2.2 m × 7 m 15 m² | £29,500 – £35,500 | £33,500 – £42,500 | £42,000 – £54,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Skipton
Postcode districts we cover around Skipton include BD23. Nearby, we also take on projects in Harrogate (21 miles), Ripon (23 miles), Northallerton (33 miles), York (40 miles).
Just over the Lancashire border, Colne is about 10 miles away. Yorkshire and the Humber combines stone-built terraces in the Pennine towns with brick semis and newer estates elsewhere, so materials and roof details need matching with care.
Will the council need to approve it?
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Kitchen-ready shell or full finish
- New boundary wall or raised party wall
- Design to keep daylight in the middle of the house
- Survey of the outrigger, boundary wall and drainage
- Removal of the side wall and new steelwork
- Glazed, sloping or flat roof with rooflights
Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Skipton home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Skipton
How long does a side return extension take to build in Skipton?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do I need building regulations approval in Skipton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for a side return extension in Skipton?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Can I combine a side return with a rear extension?
Yes. That combination is a wraparound extension, which adds the most space to a terraced house.
Book a free site visit in Skipton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.