Side return extensions for homes in Shipley

A side return extension in Shipley starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in ShipleyFrom £16,500 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsBD2, BD8, BD9, BD10, BD17
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Guide prices for Shipley

Prices below are for Shipley, using the Yorkshire and the Humber factor of ×0.94. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Shipley: £1,970 to £3,570 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£16,500 – £20,500£18,000 – £23,000£22,500 – £29,000
2 m × 5.5 m
11 m²
£21,500 – £26,000£24,500 – £31,500£31,000 – £39,500
2.2 m × 7 m
15 m²
£29,500 – £35,500£33,500 – £42,500£42,000 – £54,000

Want a range for your exact size? The guide-price tool takes about a minute.

Local to Shipley

Our survey diary covers Shipley, including BD2, BD8, BD9, BD10, BD17, BD18. The same team covers Bradford (3 miles), Bingley (3 miles), Guiseley (4 miles), Yeadon (4 miles), all within easy reach.

Yorkshire and the Humber combines stone-built terraces in the Pennine towns with brick semis and newer estates elsewhere, so materials and roof details need matching with care.

What we take care of

  • Design to keep daylight in the middle of the house
  • Party wall notice support (England and Wales)
  • New boundary wall or raised party wall
  • Kitchen-ready shell or full finish
  • Removal of the side wall and new steelwork
  • Glazed, sloping or flat roof with rooflights

Will the council need to approve it?

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about side return extensions

Do I need building regulations approval in Shipley?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for a side return extension in Shipley?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a side return extension take to build in Shipley?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Do side return extensions need planning permission?

In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.

Will the kitchen be darker?

Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.

Book a free site visit in Shipley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote