Preston side return extensions, designed and built
Planning a side return extension in Preston? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in PrestonFrom £17,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsPR1, PR2, PR4, PR5, PR25

Guide prices for Preston
For Preston we adjust our national guide rates by ×0.95, the factor we use for North West England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Preston: £2,000 to £3,610 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £17,000 – £20,500 | £18,000 – £23,000 | £22,500 – £29,000 |
| 2 m × 5.5 m 11 m² | £21,500 – £26,500 | £25,000 – £31,500 | £31,000 – £40,000 |
| 2.2 m × 7 m 15 m² | £29,500 – £36,000 | £34,000 – £43,000 | £42,500 – £54,500 |
Try the guide-price tool to see a range for your own size and finish.
What we take care of
- New boundary wall or raised party wall
- Glazed, sloping or flat roof with rooflights
- Party wall notice support (England and Wales)
- Kitchen-ready shell or full finish
- Design to keep daylight in the middle of the house
- Removal of the side wall and new steelwork
Working in Preston
Postcode districts we cover around Preston include PR1, PR2, PR4, PR5, PR25, PR26. We also work in nearby Leyland (5 miles), Chorley (9 miles), Blackburn (9 miles), Darwen (11 miles).
Just over the Greater Manchester border, Horwich is about 13 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
Do I need planning permission in Preston?
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
The planning position for a specific Preston address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Preston
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Preston, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Preston?
Yes. We cover Preston and the surrounding parts of Lancashire. Site visits are free and there is no obligation.
Who do I contract with for a side return extension in Preston?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do side return extensions need planning permission?
In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.
How much does a side return extension cost?
Our guide range is about £2,000 to £3,610 per m² including VAT, so a typical 2 m × 5.5 m infill lands around £25,000 to £31,500 at standard spec in Preston, more in London.
Book a free site visit in Preston
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.