house-extension.uk

Side return extensions across Northampton

We design and build side return extensions for houses in Northampton, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in NorthamptonFrom £17,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsNN1, NN2, NN3, NN4, NN5
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Local to Northampton

Across NN1, NN2, NN3, NN4, NN5, NN7, we can visit, measure and advise. Neighbouring towns we cover include Wellingborough (9 miles), Towcester (10 miles), Daventry (12 miles), Rushden (12 miles).

Just over the Buckinghamshire border, Milton Keynes is about 15 miles away. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

Do I need planning permission in Northampton?

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Included in a typical project

  • Kitchen-ready shell or full finish
  • Party wall notice support (England and Wales)
  • New boundary wall or raised party wall
  • Glazed, sloping or flat roof with rooflights

How much does a side return extension cost in Northampton?

For Northampton we adjust our national guide rates by ×0.95, the factor we use for East Midlands. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Northampton: £2,000 to £3,610 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£17,000 – £20,500£18,000 – £23,000£22,500 – £29,000
2 m × 5.5 m
11 m²
£21,500 – £26,500£25,000 – £31,500£31,000 – £40,000
2.2 m × 7 m
15 m²
£29,500 – £36,000£34,000 – £43,000£42,500 – £54,500

For a figure based on your own dimensions, use our guide-price tool.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Side return extension questions answered

Do I need building regulations approval in Northampton?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Northampton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do you cover all of Northampton?

Yes. We cover Northampton and the surrounding parts of Northamptonshire. Site visits are free and there is no obligation.

Do side return extensions need planning permission?

In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.

How much does a side return extension cost?

Our guide range is about £2,000 to £3,610 per m² including VAT, so a typical 2 m × 5.5 m infill lands around £25,000 to £31,500 at standard spec in Northampton, more in London.

Book a free site visit in Northampton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote