house-extension.uk

Side return extensions in Newbury

A side return extension in Newbury starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in NewburyFrom £20,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsRG14, RG20
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Extensions in and around Newbury

Across RG14, RG20, we can visit, measure and advise. Neighbouring towns we cover include Thatcham (3 miles), Reading (16 miles), Earley (18 miles), Wokingham (21 miles).

Wantage, in Oxfordshire, is roughly 14 miles from Newbury and also on our list. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

What should I budget for a side return extension in Newbury?

Prices below are for Newbury, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Newbury: £2,350 to £4,260 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£20,000 – £24,000£21,500 – £27,000£26,500 – £34,500
2 m × 5.5 m
11 m²
£25,500 – £31,000£29,500 – £37,000£36,500 – £47,000
2.2 m × 7 m
15 m²
£35,000 – £42,500£40,000 – £50,500£50,000 – £64,000

For a figure based on your own dimensions, use our guide-price tool.

What we take care of

  • New boundary wall or raised party wall
  • Kitchen-ready shell or full finish
  • Survey of the outrigger, boundary wall and drainage
  • Glazed, sloping or flat roof with rooflights

Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.

Do I need planning permission in Newbury?

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Side return extension questions answered

Do I need building regulations approval in Newbury?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a side return extension take to build in Newbury?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Do you cover all of Newbury?

Yes. We cover Newbury and the surrounding parts of Berkshire. Site visits are free and there is no obligation.

Will the kitchen be darker?

Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.

How much does a side return extension cost?

Our guide range is about £2,350 to £4,260 per m² including VAT, so a typical 2 m × 5.5 m infill lands around £29,500 to £37,000 at standard spec in Newbury, more in London.

Book a free site visit in Newbury

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote