house-extension.uk

Side return extensions across Hindley

Hindley homeowners can use us for the whole side return extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in HindleyFrom £17,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsWN2
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

What should I budget for a side return extension in Hindley?

Labour and material costs vary across the UK, so for Hindley we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Hindley: £2,000 to £3,610 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£17,000 – £20,500£18,000 – £23,000£22,500 – £29,000
2 m × 5.5 m
11 m²
£21,500 – £26,500£25,000 – £31,500£31,000 – £40,000
2.2 m × 7 m
15 m²
£29,500 – £36,000£34,000 – £43,000£42,500 – £54,500

Try the guide-price tool to see a range for your own size and finish.

Extensions in and around Hindley

Our survey diary covers Hindley, including WN2. We also work in nearby Wigan (2 miles), Westhoughton (3 miles), Leigh (4 miles), Atherton (4 miles).

Golborne, in Merseyside, is roughly 4 miles from Hindley and also on our list. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.

Who a side return extension suits

  • Narrow galley kitchens
  • Victorian and Edwardian terraces with a rear outrigger
  • Homes where the garden is too small to lose much depth

Planning and approvals in Hindley

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Side return extension questions answered

Will my neighbours in Hindley be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who do I contract with for a side return extension in Hindley?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do I need building regulations approval in Hindley?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do side return extensions need planning permission?

In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.

Can I combine a side return with a rear extension?

Yes. That combination is a wraparound extension, which adds the most space to a terraced house.

Book a free site visit in Hindley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote