Henley-on-Thames side return extensions, designed and built
From the first sketch to final sign-off, we plan and build side return extensions in Henley-on-Thames and the surrounding Oxfordshire area.
- Guide price in Henley-on-ThamesFrom £20,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsRG9

Planning and approvals in Henley-on-Thames
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Is a side return extension right for your house?
- Homes where the garden is too small to lose much depth
- Narrow galley kitchens
- Victorian and Edwardian terraces with a rear outrigger
Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.
Guide prices for Henley-on-Thames
For Henley-on-Thames we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Henley-on-Thames: £2,350 to £4,260 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £20,000 – £24,000 | £21,500 – £27,000 | £26,500 – £34,500 |
| 2 m × 5.5 m 11 m² | £25,500 – £31,000 | £29,500 – £37,000 | £36,500 – £47,000 |
| 2.2 m × 7 m 15 m² | £35,000 – £42,500 | £40,000 – £50,500 | £50,000 – £64,000 |
Try the guide-price tool to see a range for your own size and finish.
Local to Henley-on-Thames
Postcode districts we cover around Henley-on-Thames include RG9. We also work in nearby Thame (14 miles), Didcot (14 miles), Abingdon (18 miles), Oxford (20 miles).
In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Henley-on-Thames home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Side return extension questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Henley-on-Thames, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Who do I contract with for a side return extension in Henley-on-Thames?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a side return extension take to build in Henley-on-Thames?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Do side return extensions need planning permission?
In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.
Book a free site visit in Henley-on-Thames
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.