Side return extensions for homes in Croydon
A side return extension in Croydon starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in CroydonFrom £23,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsCR0, CR7, CR9, SE19, SE25

Working in Croydon
Across CR0, CR7, CR9, SE19, SE25, SM6, we can visit, measure and advise. The same team covers South Croydon (1 mile), South Norwood (2 miles), Upper Norwood (2 miles), Norbury (2 miles), all within easy reach.
Just over the Surrey border, Banstead is about 6 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Side return extension prices in Croydon
Prices below are for Croydon, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Croydon: £2,730 to £4,940 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £23,000 – £28,000 | £24,500 – £31,500 | £31,000 – £40,000 |
| 2 m × 5.5 m 11 m² | £30,000 – £36,000 | £34,000 – £43,000 | £42,500 – £54,500 |
| 2.2 m × 7 m 15 m² | £40,500 – £49,000 | £46,500 – £58,500 | £58,500 – £74,500 |
Try the guide-price tool to see a range for your own size and finish.
When a side return extension makes sense
- Victorian and Edwardian terraces with a rear outrigger
- Narrow galley kitchens
- Homes where the garden is too small to lose much depth
Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.
Will the council need to approve it?
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a side return extension in Croydon
Will my neighbours in Croydon be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a side return extension in Croydon?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a side return extension take to build in Croydon?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Can I combine a side return with a rear extension?
Yes. That combination is a wraparound extension, which adds the most space to a terraced house.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Book a free site visit in Croydon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.