Coalville side return extensions, designed and built
Coalville homeowners can use us for the whole side return extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in CoalvilleFrom £17,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsLE67

Local to Coalville
Across LE67, we can visit, measure and advise. The same team covers Loughborough (8 miles), Earl Shilton (10 miles), Leicester (12 miles), Hinckley (13 miles), all within easy reach.
Swadlincote, in Derbyshire, is roughly 9 miles from Coalville and also on our list. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
When a side return extension makes sense
- Victorian and Edwardian terraces with a rear outrigger
- Homes where the garden is too small to lose much depth
- Narrow galley kitchens
Side return extension prices in Coalville
Labour and material costs vary across the UK, so for Coalville we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Coalville: £2,000 to £3,610 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £17,000 – £20,500 | £18,000 – £23,000 | £22,500 – £29,000 |
| 2 m × 5.5 m 11 m² | £21,500 – £26,500 | £25,000 – £31,500 | £31,000 – £40,000 |
| 2.2 m × 7 m 15 m² | £29,500 – £36,000 | £34,000 – £43,000 | £42,500 – £54,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Coalville
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
The planning position for a specific Coalville address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about side return extensions
How long does a side return extension take to build in Coalville?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Will my neighbours in Coalville be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Coalville?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I combine a side return with a rear extension?
Yes. That combination is a wraparound extension, which adds the most space to a terraced house.
Do side return extensions need planning permission?
In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.
Book a free site visit in Coalville
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.