Brentwood side return extensions, designed and built
Brentwood homeowners can use us for the whole side return extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in BrentwoodFrom £19,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsCM13, CM14, CM15

What we take care of
- Survey of the outrigger, boundary wall and drainage
- Glazed, sloping or flat roof with rooflights
- Design to keep daylight in the middle of the house
- Party wall notice support (England and Wales)
Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.
What should I budget for a side return extension in Brentwood?
These guide figures apply our East of England adjustment (×1.06) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Brentwood: £2,230 to £4,030 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £19,000 – £23,000 | £20,000 – £25,500 | £25,000 – £32,500 |
| 2 m × 5.5 m 11 m² | £24,000 – £29,500 | £27,500 – £35,000 | £34,500 – £44,500 |
| 2.2 m × 7 m 15 m² | £33,000 – £40,000 | £38,000 – £48,000 | £47,500 – £60,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Brentwood
We cover Brentwood and the postcode districts CM13, CM14, CM15. Nearby, we also take on projects in Billericay (5 miles), Basildon (7 miles), South Ockendon (8 miles), Stanford-le-Hope (9 miles).
The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
Planning and approvals in Brentwood
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a side return extension in Brentwood
How long does a side return extension take to build in Brentwood?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do you cover all of Brentwood?
Yes. We cover Brentwood and the surrounding parts of Essex. Site visits are free and there is no obligation.
Do I need building regulations approval in Brentwood?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Do side return extensions need planning permission?
In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.
Book a free site visit in Brentwood
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.