Side return extensions across Abergavenny

Planning a side return extension in Abergavenny? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in AbergavennyFrom £16,500 inc VAT
  • PlanningCan be permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsNP7
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

What we take care of

  • New boundary wall or raised party wall
  • Glazed, sloping or flat roof with rooflights
  • Kitchen-ready shell or full finish
  • Design to keep daylight in the middle of the house

Side return extension prices in Abergavenny

For Abergavenny we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Abergavenny: £1,950 to £3,530 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£16,500 – £20,000£17,500 – £22,500£22,000 – £28,500
2 m × 5.5 m
11 m²
£21,000 – £26,000£24,500 – £31,000£30,500 – £39,000
2.2 m × 7 m
15 m²
£29,000 – £35,000£33,000 – £42,000£41,500 – £53,500

Try the guide-price tool to see a range for your own size and finish.

Local to Abergavenny

Our survey diary covers Abergavenny, including NP7. We also work in nearby Pontypool (9 miles), Ebbw Vale (9 miles), Cwmbran (12 miles), Monmouth (12 miles).

Just over the Mid Glamorgan border, Blackwood is about 14 miles away. Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.

Do I need planning permission in Abergavenny?

In Wales a single-storey side return can fall within permitted development if it stays within the 4 m height limit and the width rules for side extensions. Conservation areas and listed buildings need consent, and the Party Wall Act applies to work on or near a shared wall.

In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about side return extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Abergavenny, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Who do I contract with for a side return extension in Abergavenny?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a side return extension take to build in Abergavenny?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Can I combine a side return with a rear extension?

Yes. That combination is a wraparound extension, which adds the most space to a terraced house.

Will the kitchen be darker?

Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.

Book a free site visit in Abergavenny

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote