Sunbury-on-Thames side extensions, designed and built

Our design and build teams take on side extensions in Sunbury-on-Thames, from the first measured survey through planning and building control to the finished room.

  • Guide price in Sunbury-on-ThamesFrom £24,500 inc VAT
  • PlanningSingle storey can be permitted development
  • Build time10–18 weeks on site
  • Postcode districtsKT12, TW16, TW17
Single-storey side extension with a gable roof beside a block-paved drive

Guide prices for Sunbury-on-Thames

Labour and material costs vary across the UK, so for Sunbury-on-Thames we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Sunbury-on-Thames: £1,960 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 5 m
12 m²
£24,500 – £30,000£27,500 – £36,000£34,500 – £46,000
3 m × 6 m
18 m²
£35,000 – £42,500£41,000 – £53,500£52,000 – £69,000
3 m × 8 m
24 m²
£47,000 – £56,500£55,000 – £71,500£69,500 – £91,500

Want a range for your exact size? The guide-price tool takes about a minute.

Who a side extension suits

  • Houses where the rear garden is small
  • Detached and semi-detached houses with side land
  • Homes needing a utility, study or ground-floor bedroom

Councils often prefer side extensions to sit slightly back from the front of the house with a lower roof, so the original building still reads clearly. We design to those principles from the start to avoid redesigns.

Covering Sunbury-on-Thames

We cover Sunbury-on-Thames and the postcode districts KT12, TW16, TW17. The same team covers Walton-on-Thames (1 mile), West Molesey (2 miles), Ashford, Surrey (3 miles), Weybridge (3 miles), all within easy reach.

In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

Planning rules that apply in Sunbury-on-Thames

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Side extension questions answered

Who do I contract with for a side extension in Sunbury-on-Thames?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Sunbury-on-Thames, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a side extension take to build in Sunbury-on-Thames?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Can I build a side extension without planning permission?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a planning application.

How close to the boundary can I build?

It depends on height. In England, within 2 m of a boundary the eaves must not exceed 3 m under permitted development. Building on the boundary is possible but brings party wall and maintenance access issues we plan for.

Book a free site visit in Sunbury-on-Thames

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote