house-extension.uk

Side extensions across Northwich

Thinking about a side extension for your Northwich home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in NorthwichFrom £20,500 inc VAT
  • PlanningSingle storey can be permitted development
  • Build time10–18 weeks on site
  • Postcode districtsCW8, CW9
Single-storey side extension with a gable roof beside a block-paved drive

What should I budget for a side extension in Northwich?

Prices below are for Northwich, using the North West England factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Northwich: £1,660 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 5 m
12 m²
£20,500 – £25,500£23,000 – £30,500£29,500 – £39,000
3 m × 6 m
18 m²
£29,500 – £36,000£35,000 – £45,500£44,000 – £58,500
3 m × 8 m
24 m²
£39,500 – £48,000£46,500 – £60,500£59,000 – £78,000

Want a range for your exact size? The guide-price tool takes about a minute.

Extensions in and around Northwich

Across CW8, CW9, we can visit, measure and advise. We also work in nearby Winsford (5 miles), Warrington (10 miles), Runcorn (10 miles), Widnes (11 miles).

Just over the Greater Manchester border, Altrincham is about 11 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.

When a side extension makes sense

  • Detached and semi-detached houses with side land
  • Homes needing a utility, study or ground-floor bedroom
  • Houses where the rear garden is small

Councils often prefer side extensions to sit slightly back from the front of the house with a lower roof, so the original building still reads clearly. We design to those principles from the start to avoid redesigns.

Do I need planning permission in Northwich?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Common questions in Northwich

Do you cover all of Northwich?

Yes. We cover Northwich and the surrounding parts of Cheshire. Site visits are free and there is no obligation.

Who do I contract with for a side extension in Northwich?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Northwich be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How close to the boundary can I build?

It depends on height. In England, within 2 m of a boundary the eaves must not exceed 3 m under permitted development. Building on the boundary is possible but brings party wall and maintenance access issues we plan for.

Can I build over my driveway?

Yes, if the foundations work and you keep any parking the council requires. Drains and services under drives are common, so we check before design.

Book a free site visit in Northwich

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote