house-extension.uk

Side extensions in Frome: design, approvals and build

Thinking about a side extension for your Frome home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in FromeFrom £22,000 inc VAT
  • PlanningSingle storey can be permitted development
  • Build time10–18 weeks on site
  • Postcode districtsBA11
Single-storey side extension with a gable roof beside a block-paved drive

Local to Frome

Our survey diary covers Frome, including BA11. Neighbouring towns we cover include Bath (10 miles), Keynsham (15 miles), Nailsea (24 miles), Yeovil (24 miles).

Just over the Wiltshire border, Warminster is about 7 miles away. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.

Side extension prices in Frome

For Frome we adjust our national guide rates by ×1.02, the factor we use for South West England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Frome: £1,780 to £3,470 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 5 m
12 m²
£22,000 – £27,000£25,000 – £32,500£31,500 – £42,000
3 m × 6 m
18 m²
£32,000 – £39,000£37,500 – £49,000£47,500 – £62,500
3 m × 8 m
24 m²
£42,500 – £51,500£50,000 – £65,000£63,500 – £83,500

Want a range for your exact size? The guide-price tool takes about a minute.

Do I need planning permission in Frome?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.

The planning position for a specific Frome address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Planning route checked or application made
  • Structure, roof tied into the house
  • Foundations near boundaries and any drains
  • Windows, doors and finishes to match

Councils often prefer side extensions to sit slightly back from the front of the house with a lower roof, so the original building still reads clearly. We design to those principles from the start to avoid redesigns.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Common questions in Frome

How long does a side extension take to build in Frome?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Will my neighbours in Frome be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who do I contract with for a side extension in Frome?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How close to the boundary can I build?

It depends on height. In England, within 2 m of a boundary the eaves must not exceed 3 m under permitted development. Building on the boundary is possible but brings party wall and maintenance access issues we plan for.

Can I build over my driveway?

Yes, if the foundations work and you keep any parking the council requires. Drains and services under drives are common, so we check before design.

Book a free site visit in Frome

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote