Pitched roof extensions in Washington

Planning a pitched roof extension in Washington? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in WashingtonFrom £20,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsDH4, NE9, NE10, NE37, NE38
Single-storey extension with a clay-tiled pitched roof and roof windows

What should I budget for a pitched roof extension in Washington?

These guide figures apply our North East England adjustment (×0.91) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Washington: £1,680 to £3,180 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£20,000 – £23,500£23,000 – £30,500£30,000 – £38,500
4 m × 5 m
20 m²
£33,500 – £39,500£39,000 – £50,500£50,000 – £64,000
5 m × 6 m
30 m²
£50,500 – £59,000£58,500 – £75,500£75,000 – £96,000

For a figure based on your own dimensions, use our guide-price tool.

Covering Washington

Across DH4, NE9, NE10, NE37, NE38, SR4, we can visit, measure and advise. The same team covers Felling (4 miles), Houghton-le-Spring (5 miles), Hebburn (5 miles), Sunderland (5 miles), all within easy reach.

The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.

Do I need planning permission in Washington?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • Vaulted ceilings or flat ceilings with storage above
  • Insulation to current building regulations
  • Roof design matched to the existing pitch and tiles
  • Lead or proprietary flashings to the main wall
  • Roof windows positioned for light and ventilation

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Washington home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Your questions about a pitched roof extension in Washington

Will my neighbours in Washington be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Washington, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a pitched roof extension take to build in Washington?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Is a pitched roof better than a flat roof?

Neither is better in all cases. Pitched roofs blend with traditional houses and shed water quickly; flat roofs give more headroom and suit modern designs and lanterns.

Can I have a vaulted ceiling?

Yes. A vaulted ceiling with roof windows is one of the main reasons to choose a pitched roof. It needs insulation between and under the rafters to meet the building regulations.

Book a free site visit in Washington

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote