house-extension.uk

Pitched roof extensions for homes in Stourbridge

If you live in Stourbridge and want more space without moving, a pitched roof extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in StourbridgeFrom £21,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsB63, B64, DY5, DY6, DY8
Single-storey extension with a clay-tiled pitched roof and roof windows

What should I budget for a pitched roof extension in Stourbridge?

Labour and material costs vary across the UK, so for Stourbridge we use our West Midlands factor (×0.97). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Stourbridge: £1,790 to £3,400 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£21,500 – £25,500£25,000 – £32,500£32,000 – £41,000
4 m × 5 m
20 m²
£35,500 – £42,000£41,500 – £53,500£53,000 – £68,000
5 m × 6 m
30 m²
£53,500 – £63,000£62,500 – £80,500£80,000 – £102,000

For a figure based on your own dimensions, use our guide-price tool.

What we take care of

  • Lead or proprietary flashings to the main wall
  • Roof design matched to the existing pitch and tiles
  • Insulation to current building regulations
  • Roof windows positioned for light and ventilation
  • Vaulted ceilings or flat ceilings with storage above

Matching tiles is harder than it sounds. We source reclaimed or closest-match tiles where the originals are no longer made and agree samples with you before ordering.

Local to Stourbridge

Site visits are available across Stourbridge (B63, B64, DY5, DY6, DY8, DY9). The same team covers Brierley Hill (2 miles), Kingswinford (3 miles), Dudley (4 miles), Halesowen (4 miles), all within easy reach.

Kidderminster, in Worcestershire, is roughly 7 miles from Stourbridge and also on our list. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Stourbridge home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions people ask about pitched roof extensions

Do I need building regulations approval in Stourbridge?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for a pitched roof extension in Stourbridge?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a pitched roof extension take to build in Stourbridge?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

How much does a pitched roof extension cost?

Our guide range is about £1,790 to £3,400 per m² including VAT, a little more than a flat roof because of the roof structure and tiles.

Can I have a vaulted ceiling?

Yes. A vaulted ceiling with roof windows is one of the main reasons to choose a pitched roof. It needs insulation between and under the rafters to meet the building regulations.

Book a free site visit in Stourbridge

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote