Pitched roof extensions in South Ruislip
Planning a pitched roof extension in South Ruislip? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in South RuislipFrom £28,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsHA4, UB5

What should I budget for a pitched roof extension in South Ruislip?
Prices below are for South Ruislip, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.
Typical rates in South Ruislip: £2,400 to £4,550 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £28,500 – £34,000 | £33,500 – £43,000 | £42,500 – £55,000 |
| 4 m × 5 m 20 m² | £48,000 – £56,000 | £55,500 – £71,500 | £71,500 – £91,000 |
| 5 m × 6 m 30 m² | £72,000 – £84,000 | £83,500 – £107,500 | £107,000 – £136,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in South Ruislip
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific South Ruislip address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Lead or proprietary flashings to the main wall
- Roof design matched to the existing pitch and tiles
- Roof windows positioned for light and ventilation
- Vaulted ceilings or flat ceilings with storage above
- Insulation to current building regulations
Extensions in and around South Ruislip
We cover South Ruislip and the postcode districts HA4, UB5. The same team covers Ruislip (1 mile), Northolt (2 miles), Hayes (Hillingdon) (3 miles), Pinner (3 miles), all within easy reach.
Bushey, in Hertfordshire, is roughly 6 miles from South Ruislip and also on our list. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Pitched roof extension questions answered
Who do I contract with for a pitched roof extension in South Ruislip?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in South Ruislip be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for South Ruislip, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Is a pitched roof better than a flat roof?
Neither is better in all cases. Pitched roofs blend with traditional houses and shed water quickly; flat roofs give more headroom and suit modern designs and lanterns.
Can I have a vaulted ceiling?
Yes. A vaulted ceiling with roof windows is one of the main reasons to choose a pitched roof. It needs insulation between and under the rafters to meet the building regulations.
Book a free site visit in South Ruislip
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.