Pitched roof extensions across Bury
Our design and build teams take on pitched roof extensions in Bury, from the first measured survey through planning and building control to the finished room.
- Guide price in BuryFrom £21,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsBL0, BL8, BL9, M26, OL10

Local to Bury
We cover Bury and the postcode districts BL0, BL8, BL9, M26, OL10. Neighbouring towns we cover include Radcliffe (3 miles), Heywood (3 miles), Whitefield (3 miles), Prestwich (5 miles).
Just over the Lancashire border, Rawtenstall is about 7 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
Guide prices for Bury
Labour and material costs vary across the UK, so for Bury we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Bury: £1,760 to £3,320 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £21,000 – £25,000 | £24,500 – £31,500 | £31,000 – £40,000 |
| 4 m × 5 m 20 m² | £35,000 – £41,000 | £40,500 – £52,500 | £52,000 – £66,500 |
| 5 m × 6 m 30 m² | £52,500 – £61,500 | £61,000 – £78,500 | £78,000 – £100,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Bury?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
When a pitched roof extension makes sense
- Conservation-sensitive streets
- Traditional, period and rural houses
- Homeowners who prefer a vaulted ceiling
Matching tiles is harder than it sounds. We source reclaimed or closest-match tiles where the originals are no longer made and agree samples with you before ordering.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a pitched roof extension in Bury
Who do I contract with for a pitched roof extension in Bury?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Bury?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Bury be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is a pitched roof better than a flat roof?
Neither is better in all cases. Pitched roofs blend with traditional houses and shed water quickly; flat roofs give more headroom and suit modern designs and lanterns.
Can I have a vaulted ceiling?
Yes. A vaulted ceiling with roof windows is one of the main reasons to choose a pitched roof. It needs insulation between and under the rafters to meet the building regulations.
Book a free site visit in Bury
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.