Pitched roof extensions for homes in Buckinghamshire
Thinking about a pitched roof extension for your Buckinghamshire home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide priceFrom £24,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Towns covered9
- Site visitFree, no obligation

Towns in Buckinghamshire
How much does a pitched roof extension cost in Buckinghamshire?
For Buckinghamshire we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Buckinghamshire: £2,070 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £24,500 – £29,000 | £28,500 – £37,000 | £36,500 – £47,500 |
| 4 m × 5 m 20 m² | £41,000 – £48,500 | £48,000 – £62,000 | £61,500 – £78,500 |
| 5 m × 6 m 30 m² | £62,000 – £72,500 | £72,000 – £92,500 | £92,000 – £118,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Buckinghamshire
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Buckinghamshire address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
When a pitched roof extension makes sense
- Traditional, period and rural houses
- Homeowners who prefer a vaulted ceiling
- Conservation-sensitive streets
Matching tiles is harder than it sounds. We source reclaimed or closest-match tiles where the originals are no longer made and agree samples with you before ordering.
Local to Buckinghamshire
Towns we cover in Buckinghamshire include Milton Keynes, High Wycombe, Aylesbury, Bletchley, Amersham, Chesham, Gerrards Cross, Chalfont St Peter. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Buckinghamshire home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a pitched roof extension in Buckinghamshire
Do you cover all of Buckinghamshire?
Yes, across the whole of Buckinghamshire. Site visits are free and there is no obligation.
Who do I contract with for a pitched roof extension in Buckinghamshire?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a pitched roof extension take to build in Buckinghamshire?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Can I have a vaulted ceiling?
Yes. A vaulted ceiling with roof windows is one of the main reasons to choose a pitched roof. It needs insulation between and under the rafters to meet the building regulations.
Is a pitched roof better than a flat roof?
Neither is better in all cases. Pitched roofs blend with traditional houses and shed water quickly; flat roofs give more headroom and suit modern designs and lanterns.
Book a free site visit in Buckinghamshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.