house-extension.uk

Pitched roof extensions across Acton

From the first sketch to final sign-off, we plan and build pitched roof extensions in Acton and the surrounding Greater London area.

  • Guide price in ActonFrom £28,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsTW8, W3, W4, W5, W12
Single-storey extension with a clay-tiled pitched roof and roof windows

Pitched roof extension prices in Acton

These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Acton: £2,400 to £4,550 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£28,500 – £34,000£33,500 – £43,000£42,500 – £55,000
4 m × 5 m
20 m²
£48,000 – £56,000£55,500 – £71,500£71,500 – £91,000
5 m × 6 m
30 m²
£72,000 – £84,000£83,500 – £107,500£107,000 – £136,500

Want a range for your exact size? The guide-price tool takes about a minute.

Included in a typical project

  • Lead or proprietary flashings to the main wall
  • Roof windows positioned for light and ventilation
  • Vaulted ceilings or flat ceilings with storage above
  • Insulation to current building regulations
  • Roof design matched to the existing pitch and tiles

Matching tiles is harder than it sounds. We source reclaimed or closest-match tiles where the originals are no longer made and agree samples with you before ordering.

Working in Acton

Across TW8, W3, W4, W5, W12, W13, we can visit, measure and advise. We also work in nearby Chiswick (1 mile), Harlesden (2 miles), Shepherds Bush (2 miles), Willesden (2 miles).

Just over the Surrey border, East Molesey is about 8 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.

Do I need planning permission in Acton?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions people ask about pitched roof extensions

How long does a pitched roof extension take to build in Acton?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Will my neighbours in Acton be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Acton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How much does a pitched roof extension cost?

Our guide range is about £2,400 to £4,550 per m² including VAT, a little more than a flat roof because of the roof structure and tiles.

Is a pitched roof better than a flat roof?

Neither is better in all cases. Pitched roofs blend with traditional houses and shed water quickly; flat roofs give more headroom and suit modern designs and lanterns.

Book a free site visit in Acton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote