Extensions over a garage for homes in Willenhall
From the first sketch to final sign-off, we plan and build over-garage extensions in Willenhall and the surrounding West Midlands area.
- Guide price in WillenhallFrom £23,000 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsWS10, WV1, WV11, WV12, WV13

Extensions in and around Willenhall
Site visits are available across Willenhall (WS10, WV1, WV11, WV12, WV13, WV14). Nearby, we also take on projects in Wednesfield (1 mile), Wolverhampton (3 miles), Wednesbury (3 miles), Walsall (3 miles).
Great Wyrley, in Staffordshire, is roughly 6 miles from Willenhall and also on our list. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
Over-garage extension prices in Willenhall
Prices below are for Willenhall, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Willenhall: £1,750 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £23,000 – £28,500 | £24,000 – £31,500 | £31,000 – £40,000 |
| Over a large single garage 16 m² | £27,500 – £34,500 | £32,500 – £42,000 | £41,500 – £53,000 |
| Over a double garage 24 m² | £41,500 – £51,500 | £48,500 – £63,000 | £62,500 – £79,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
When an over-garage extension makes sense
- Detached and link-detached houses with an attached garage
- Families needing a bedroom without losing garden
- Homes where the landing can connect to the new room
Planning rules that apply in Willenhall
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Over-garage extension questions answered
Will my neighbours in Willenhall be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Willenhall?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does an over-garage extension take to build in Willenhall?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Willenhall
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.