Extensions over a garage across Stafford

Our design and build teams take on over-garage extensions in Stafford, from the first measured survey through planning and building control to the finished room.

  • Guide price in StaffordFrom £23,000 inc VAT
  • PlanningHouseholder application needed
  • Build time12–18 weeks on site
  • Postcode districtsST16, ST17, ST18
Detached house with a bedroom extension above the attached garage

Working in Stafford

Across ST16, ST17, ST18, we can visit, measure and advise. Nearby, we also take on projects in Rugeley (8 miles), Cannock (9 miles), Great Wyrley (11 miles), Burntwood (12 miles).

The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

Over-garage extension prices in Stafford

Prices below are for Stafford, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Stafford: £1,750 to £3,300 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Over a single garage
12 m²
£23,000 – £28,500£24,000 – £31,500£31,000 – £40,000
Over a large single garage
16 m²
£27,500 – £34,500£32,500 – £42,000£41,500 – £53,000
Over a double garage
24 m²
£41,500 – £51,500£48,500 – £63,000£62,500 – £79,500

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Stafford?

In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who an over-garage extension suits

  • Families needing a bedroom without losing garden
  • Homes where the landing can connect to the new room
  • Detached and link-detached houses with an attached garage

Fitting the new room to the existing landing is the planning puzzle inside the house. We design the connection first, then the roof, so the extension does not end up with awkward steps or a corridor through a bedroom.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about over-garage extensions

How long does an over-garage extension take to build in Stafford?

On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Do you cover all of Stafford?

Yes. We cover Stafford and the surrounding parts of Staffordshire. Site visits are free and there is no obligation.

Will my neighbours in Stafford be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Does building over a garage need planning permission?

In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.

Can I keep using the garage during the build?

Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.

Book a free site visit in Stafford

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote