Extensions over a garage in Richmond: design, approvals and build
A over-garage extension in Richmond starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in RichmondFrom £31,000 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsSW14, TW1, TW7, TW8, TW9

Included in a typical project
- Opening into the existing first floor
- Insulation, electrics, heating and finish
- Strengthening or rebuilding the garage walls if needed
- New floor structure, walls and roof
- Design and householder planning application
- Structural survey of garage walls and foundations
How much does an over-garage extension cost in Richmond?
Labour and material costs vary across the UK, so for Richmond we use our London factor (×1.3). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Richmond: £2,340 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £31,000 – £38,500 | £32,500 – £42,500 | £42,000 – £53,500 |
| Over a large single garage 16 m² | £37,000 – £46,000 | £43,500 – £56,500 | £56,000 – £71,000 |
| Over a double garage 24 m² | £56,000 – £69,000 | £65,500 – £84,500 | £84,000 – £106,500 |
Try the guide-price tool to see a range for your own size and finish.
Extensions in and around Richmond
Across SW14, TW1, TW7, TW8, TW9, TW10, we can visit, measure and advise. The same team covers Isleworth (2 miles), Hounslow (2 miles), Barnes (3 miles), Roehampton (3 miles), all within easy reach.
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Do I need planning permission in Richmond?
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
The planning position for a specific Richmond address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Over-garage extension questions answered
Do I need building regulations approval in Richmond?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Richmond be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does an over-garage extension take to build in Richmond?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Richmond
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.