house-extension.uk

Extensions over a garage in Oadby: design, approvals and build

Planning an over-garage extension in Oadby? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in OadbyFrom £22,500 inc VAT
  • PlanningHouseholder application needed
  • Build time12–18 weeks on site
  • Postcode districtsLE2, LE5, LE18
Detached house with a bedroom extension above the attached garage

How much does an over-garage extension cost in Oadby?

These guide figures apply our East Midlands adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Oadby: £1,710 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Over a single garage
12 m²
£22,500 – £28,000£23,500 – £31,000£30,500 – £39,000
Over a large single garage
16 m²
£27,000 – £33,500£31,500 – £41,500£41,000 – £52,000
Over a double garage
24 m²
£41,000 – £50,500£47,500 – £62,000£61,500 – £78,000

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Oadby?

In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • Design and householder planning application
  • Insulation, electrics, heating and finish
  • Opening into the existing first floor
  • New floor structure, walls and roof

Fitting the new room to the existing landing is the planning puzzle inside the house. We design the connection first, then the roof, so the extension does not end up with awkward steps or a corridor through a bedroom.

Working in Oadby

Site visits are available across Oadby (LE2, LE5, LE18). Nearby, we also take on projects in Wigston (2 miles), Leicester (3 miles), Earl Shilton (10 miles), Loughborough (12 miles).

For homes towards Northamptonshire, Market Harborough is around 11 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions people ask about over-garage extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Oadby, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Will my neighbours in Oadby be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Oadby?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I keep using the garage during the build?

Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.

Can my garage take the weight of a room on top?

Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.

Book a free site visit in Oadby

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote