Extensions over a garage in Nottinghamshire
Thinking about an over-garage extension for your Nottinghamshire home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide priceFrom £22,500 inc VAT
- PlanningHouseholder application needed
- Towns covered12
- Site visitFree, no obligation

Towns in Nottinghamshire
Over-garage extension prices in Nottinghamshire
Prices below are for Nottinghamshire, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Nottinghamshire: £1,710 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £22,500 – £28,000 | £23,500 – £31,000 | £30,500 – £39,000 |
| Over a large single garage 16 m² | £27,000 – £33,500 | £31,500 – £41,500 | £41,000 – £52,000 |
| Over a double garage 24 m² | £41,000 – £50,500 | £47,500 – £62,000 | £61,500 – £78,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Local to Nottinghamshire
Towns we cover in Nottinghamshire include Nottingham, Mansfield, Worksop, Newark-on-Trent, Arnold, West Bridgford, Sutton-in-Ashfield, Hucknall. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
Do I need planning permission in Nottinghamshire?
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
When an over-garage extension makes sense
- Homes where the landing can connect to the new room
- Detached and link-detached houses with an attached garage
- Families needing a bedroom without losing garden
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Nottinghamshire home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about over-garage extensions
Do I need building regulations approval in Nottinghamshire?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for an over-garage extension in Nottinghamshire?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Nottinghamshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can my garage take the weight of a room on top?
Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Book a free site visit in Nottinghamshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.