Extensions over a garage for homes in Hook
Our design and build teams take on over-garage extensions in Hook, from the first measured survey through planning and building control to the finished room.
- Guide price in HookFrom £31,000 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsKT5, KT6, KT9

Working in Hook
Site visits are available across Hook (KT5, KT6, KT9). Nearby, we also take on projects in Chessington (0 miles), Surbiton (2 miles), Worcester Park (3 miles), New Malden (3 miles).
Just over the Surrey border, Esher is about 3 miles away. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Who an over-garage extension suits
- Detached and link-detached houses with an attached garage
- Homes where the landing can connect to the new room
- Families needing a bedroom without losing garden
Fitting the new room to the existing landing is the planning puzzle inside the house. We design the connection first, then the roof, so the extension does not end up with awkward steps or a corridor through a bedroom.
How much does an over-garage extension cost in Hook?
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Hook: £2,340 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £31,000 – £38,500 | £32,500 – £42,500 | £42,000 – £53,500 |
| Over a large single garage 16 m² | £37,000 – £46,000 | £43,500 – £56,500 | £56,000 – £71,000 |
| Over a double garage 24 m² | £56,000 – £69,000 | £65,500 – £84,500 | £84,000 – £106,500 |
For a figure based on your own dimensions, use our guide-price tool.
Planning rules that apply in Hook
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about over-garage extensions
Will my neighbours in Hook be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for an over-garage extension in Hook?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does an over-garage extension take to build in Hook?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can my garage take the weight of a room on top?
Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Book a free site visit in Hook
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.