Hertford over-garage extensions, designed and built
Our design and build teams take on over-garage extensions in Hertford, from the first measured survey through planning and building control to the finished room.
- Guide price in HertfordFrom £25,000 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsSG13, SG14

Who an over-garage extension suits
- Detached and link-detached houses with an attached garage
- Families needing a bedroom without losing garden
- Homes where the landing can connect to the new room
Fitting the new room to the existing landing is the planning puzzle inside the house. We design the connection first, then the roof, so the extension does not end up with awkward steps or a corridor through a bedroom.
Extensions in and around Hertford
Across SG13, SG14, we can visit, measure and advise. Neighbouring towns we cover include Hoddesdon (4 miles), Welwyn Garden City (6 miles), Hatfield (7 miles), Cheshunt (7 miles).
Waltham Abbey, in Essex, is roughly 8 miles from Hertford and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Guide prices for Hertford
Prices below are for Hertford, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Hertford: £1,910 to £3,600 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £25,000 – £31,500 | £26,500 – £34,500 | £34,000 – £43,500 |
| Over a large single garage 16 m² | £30,500 – £37,500 | £35,500 – £46,000 | £45,500 – £58,000 |
| Over a double garage 24 m² | £45,500 – £56,000 | £53,000 – £69,000 | £68,500 – £86,500 |
For a figure based on your own dimensions, use our guide-price tool.
Planning and approvals in Hertford
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about over-garage extensions
Do I need building regulations approval in Hertford?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for an over-garage extension in Hertford?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Hertford be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Hertford
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.