Extensions over a garage in Halesowen: design, approvals and build
If you live in Halesowen and want more space without moving, an over-garage extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in HalesowenFrom £23,000 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsB32, B62, B63, B64, B65

Is an over-garage extension right for your house?
- Families needing a bedroom without losing garden
- Detached and link-detached houses with an attached garage
- Homes where the landing can connect to the new room
Local to Halesowen
Our survey diary covers Halesowen, including B32, B62, B63, B64, B65, B68. We also work in nearby Brierley Hill (4 miles), Dudley (4 miles), Stourbridge (4 miles), Smethwick (5 miles).
The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Over-garage extension prices in Halesowen
Prices below are for Halesowen, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Halesowen: £1,750 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £23,000 – £28,500 | £24,000 – £31,500 | £31,000 – £40,000 |
| Over a large single garage 16 m² | £27,500 – £34,500 | £32,500 – £42,000 | £41,500 – £53,000 |
| Over a double garage 24 m² | £41,500 – £51,500 | £48,500 – £63,000 | £62,500 – £79,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Halesowen
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Halesowen
Will my neighbours in Halesowen be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does an over-garage extension take to build in Halesowen?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Do I need building regulations approval in Halesowen?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How much does a room over a garage cost?
Our guide range is about £1,750 to £3,300 per m² including VAT. A single-garage room of about 12 m² usually costs £24,000 to £31,500 at standard spec, more if the garage needs rebuilding.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Book a free site visit in Halesowen
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .