house-extension.uk

Extensions over a garage in Greenford: design, approvals and build

Our design and build teams take on over-garage extensions in Greenford, from the first measured survey through planning and building control to the finished room.

  • Guide price in GreenfordFrom £31,000 inc VAT
  • PlanningHouseholder application needed
  • Build time12–18 weeks on site
  • Postcode districtsUB1, UB4, UB5, UB6, W7
Detached house with a bedroom extension above the attached garage

Extensions in and around Greenford

Site visits are available across Greenford (UB1, UB4, UB5, UB6, W7, W13). Neighbouring towns we cover include Northolt (1 mile), Southall (2 miles), South Ruislip (3 miles), Wembley (3 miles).

For homes towards Hertfordshire, Bushey is around 8 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Over-garage extension prices in Greenford

Labour and material costs vary across the UK, so for Greenford we use our London factor (×1.3). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Greenford: £2,340 to £4,420 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Over a single garage
12 m²
£31,000 – £38,500£32,500 – £42,500£42,000 – £53,500
Over a large single garage
16 m²
£37,000 – £46,000£43,500 – £56,500£56,000 – £71,000
Over a double garage
24 m²
£56,000 – £69,000£65,500 – £84,500£84,000 – £106,500

For a figure based on your own dimensions, use our guide-price tool.

Planning rules that apply in Greenford

In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who an over-garage extension suits

  • Detached and link-detached houses with an attached garage
  • Homes where the landing can connect to the new room
  • Families needing a bedroom without losing garden

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions people ask about over-garage extensions

Do I need building regulations approval in Greenford?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for an over-garage extension in Greenford?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Greenford be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I keep using the garage during the build?

Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.

Does building over a garage need planning permission?

In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.

Book a free site visit in Greenford

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote