Extensions over a garage for homes in Daventry
If you live in Daventry and want more space without moving, an over-garage extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in DaventryFrom £22,500 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsNN11

Included in a typical project
- Insulation, electrics, heating and finish
- New floor structure, walls and roof
- Design and householder planning application
- Structural survey of garage walls and foundations
Working in Daventry
Postcode districts we cover around Daventry include NN11. The same team covers Towcester (11 miles), Northampton (12 miles), Brackley (16 miles), Market Harborough (18 miles), all within easy reach.
For homes towards Warwickshire, Rugby is around 9 miles away. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
Guide prices for Daventry
Labour and material costs vary across the UK, so for Daventry we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Daventry: £1,710 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £22,500 – £28,000 | £23,500 – £31,000 | £30,500 – £39,000 |
| Over a large single garage 16 m² | £27,000 – £33,500 | £31,500 – £41,500 | £41,000 – £52,000 |
| Over a double garage 24 m² | £41,000 – £50,500 | £47,500 – £62,000 | £61,500 – £78,000 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Daventry
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about an over-garage extension in Daventry
How long does an over-garage extension take to build in Daventry?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Do I need building regulations approval in Daventry?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Daventry, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Can my garage take the weight of a room on top?
Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Daventry
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.