house-extension.uk

Extensions over a garage for homes in Canning Town

If you live in Canning Town and want more space without moving, an over-garage extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in Canning TownFrom £31,000 inc VAT
  • PlanningHouseholder application needed
  • Build time12–18 weeks on site
  • Postcode districtsE3, E6, E13, E14, E15
Detached house with a bedroom extension above the attached garage

Guide prices for Canning Town

These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Canning Town: £2,340 to £4,420 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Over a single garage
12 m²
£31,000 – £38,500£32,500 – £42,500£42,000 – £53,500
Over a large single garage
16 m²
£37,000 – £46,000£43,500 – £56,500£56,000 – £71,000
Over a double garage
24 m²
£56,000 – £69,000£65,500 – £84,500£84,000 – £106,500

Try the guide-price tool to see a range for your own size and finish.

Extensions in and around Canning Town

We cover Canning Town and the postcode districts E3, E6, E13, E14, E15, E16. We also work in nearby West Ham (1 mile), Stratford (2 miles), Bow (2 miles), Stepney (3 miles).

In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Planning rules that apply in Canning Town

In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • New floor structure, walls and roof
  • Insulation, electrics, heating and finish
  • Design and householder planning application
  • Opening into the existing first floor

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Canning Town home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Common questions in Canning Town

Do I need building regulations approval in Canning Town?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for an over-garage extension in Canning Town?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Canning Town, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Can my garage take the weight of a room on top?

Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.

Does building over a garage need planning permission?

In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.

Book a free site visit in Canning Town

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote