Extensions over a garage across Bicester
We design and build over-garage extensions for houses in Bicester, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in BicesterFrom £26,500 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsOX6, OX25, OX26, OX27

Extensions in and around Bicester
Our survey diary covers Bicester, including OX6, OX25, OX26, OX27. The same team covers Oxford (11 miles), Thame (13 miles), Banbury (14 miles), Witney (16 miles), all within easy reach.
In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
Over-garage extension prices in Bicester
Labour and material costs vary across the UK, so for Bicester we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Bicester: £2,020 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £26,500 – £33,000 | £28,000 – £36,500 | £36,000 – £46,000 |
| Over a large single garage 16 m² | £32,000 – £39,500 | £37,500 – £48,500 | £48,000 – £61,000 |
| Over a double garage 24 m² | £48,000 – £59,500 | £56,000 – £73,000 | £72,500 – £91,500 |
For a figure based on your own dimensions, use our guide-price tool.
Included in a typical project
- Structural survey of garage walls and foundations
- New floor structure, walls and roof
- Strengthening or rebuilding the garage walls if needed
- Design and householder planning application
- Insulation, electrics, heating and finish
- Opening into the existing first floor
Planning and approvals in Bicester
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Bicester home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Bicester
Will my neighbours in Bicester be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Bicester?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Bicester, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Can my garage take the weight of a room on top?
Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.
Book a free site visit in Bicester
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.