Extensions over a garage in Ashford, Kent
Our design and build teams take on over-garage extensions in Ashford, Kent, from the first measured survey through planning and building control to the finished room.
- Guide price in Ashford, KentFrom £26,500 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsTN23, TN24, TN25

Is an over-garage extension right for your house?
- Detached and link-detached houses with an attached garage
- Homes where the landing can connect to the new room
- Families needing a bedroom without losing garden
Working in Ashford, Kent
Across TN23, TN24, TN25, we can visit, measure and advise. We also work in nearby Faversham (12 miles), Canterbury (13 miles), Folkestone (13 miles), Sittingbourne (15 miles).
For homes towards East Sussex, Hastings is around 24 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Over-garage extension prices in Ashford, Kent
Labour and material costs vary across the UK, so for Ashford, Kent we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Ashford, Kent: £2,020 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £26,500 – £33,000 | £28,000 – £36,500 | £36,000 – £46,000 |
| Over a large single garage 16 m² | £32,000 – £39,500 | £37,500 – £48,500 | £48,000 – £61,000 |
| Over a double garage 24 m² | £48,000 – £59,500 | £56,000 – £73,000 | £72,500 – £91,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Ashford, Kent
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Ashford, Kent
How long does an over-garage extension take to build in Ashford, Kent?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Do I need building regulations approval in Ashford, Kent?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Ashford, Kent be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Ashford, Kent
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.