house-extension.uk

Orangery extensions in Wrexham

Planning an orangery extension in Wrexham? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in WrexhamFrom £27,500 inc VAT
  • PlanningWelsh permitted development rules (rear up to 4 m)
  • Build time10–16 weeks on site
  • Postcode districtsLL11, LL12, LL13
Orangery extension with brick piers, a glass roof lantern and French doors

How much does an orangery extension cost in Wrexham?

For Wrexham we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Wrexham: £2,230 to £4,180 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£27,500 – £34,000£31,000 – £39,500£37,500 – £50,500
4 m × 4 m
16 m²
£35,500 – £43,500£41,500 – £52,500£50,500 – £67,000
4 m × 6 m
24 m²
£53,500 – £65,000£62,000 – £78,500£75,500 – £100,500

Want a range for your exact size? The guide-price tool takes about a minute.

Working in Wrexham

Across LL11, LL12, LL13, we can visit, measure and advise. Neighbouring towns we cover include Rhosllannerchrugog (4 miles), Buckley (9 miles), Hawarden (10 miles), Deeside (11 miles).

In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

Planning rules that apply in Wrexham

In Wales a glazed or orangery-style extension follows the normal single-storey limits (up to 4 m at the rear). Welsh building regulations also limit glazing and heat loss, so glass-heavy designs need calculations.

Homes in conservation areas, national parks, National Landscapes (AONBs) and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

What is included

  • Thermal calculations where glazing is generous
  • Design of piers, roof perimeter and lantern proportions
  • Heating sized for the glass area
  • Opening into the main house
  • Aluminium or timber lantern and full-height glazing
  • Foundations, walls and insulated perimeter roof

The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Wrexham

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Wrexham, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does an orangery extension take to build in Wrexham?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Will my neighbours in Wrexham be involved?

If a planning application is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Will an orangery be too hot in summer?

Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.

Book a free site visit in Wrexham

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote