Orangery extensions for homes in West Yorkshire
If you live in West Yorkshire and want more space without moving, an orangery extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide priceFrom £28,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Towns covered24
- Site visitFree, no obligation

Towns in West Yorkshire
Is an orangery extension right for your house?
- Those who want daylight without overheating
- Homeowners replacing an older conservatory
- Period and detached houses with a garden view
Guide prices for West Yorkshire
These guide figures apply our Yorkshire and the Humber adjustment (×0.94) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in West Yorkshire: £2,260 to £4,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £28,000 – £34,500 | £31,500 – £39,500 | £38,000 – £51,000 |
| 4 m × 4 m 16 m² | £36,000 – £44,000 | £42,000 – £53,000 | £51,000 – £68,000 |
| 4 m × 6 m 24 m² | £54,000 – £65,500 | £63,000 – £79,000 | £76,500 – £102,000 |
For a figure based on your own dimensions, use our guide-price tool.
Working in West Yorkshire
Towns we cover in West Yorkshire include Leeds, Bradford, Huddersfield, Wakefield, Halifax, Dewsbury, Morley, Keighley. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.
Do I need planning permission in West Yorkshire?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in West Yorkshire
Will my neighbours in West Yorkshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for West Yorkshire, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does an orangery extension take to build in West Yorkshire?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in West Yorkshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.