Orangery extensions across Rutland
Planning an orangery extension in Rutland? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide priceFrom £28,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Towns covered2
- Site visitFree, no obligation

When an orangery extension makes sense
- Those who want daylight without overheating
- Period and detached houses with a garden view
- Homeowners replacing an older conservatory
What should I budget for an orangery extension in Rutland?
For Rutland we adjust our national guide rates by ×0.95, the factor we use for East Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Rutland: £2,280 to £4,280 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £28,500 – £34,500 | £31,500 – £40,000 | £38,500 – £51,500 |
| 4 m × 4 m 16 m² | £36,000 – £44,500 | £42,500 – £53,500 | £51,500 – £68,500 |
| 4 m × 6 m 24 m² | £54,500 – £66,500 | £63,500 – £80,000 | £77,500 – £103,000 |
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in Rutland
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Rutland
Towns we cover in Rutland include Oakham, Uppingham. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Rutland
Who do I contract with for an orangery extension in Rutland?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do you cover all of Rutland?
Yes, across the whole of Rutland. Site visits are free and there is no obligation.
Do I need building regulations approval in Rutland?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
Book a free site visit in Rutland
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.